First Baptist Church of Glenarden

  • Large 9,500-member church needed a complete audiovisual infrastructure-including over 100,000 feet of cabling-within a two-month timeframe.
  • TECH inc developed an efficient installation plan to fully utilize existing building spaces and pathways.
  • We quickly mobilized scalable manpower to accommodate church functions and meet the accelerated schedule.
  • We coordinated with the audiovisual equipment manufacturer to ensure a matched system.
  • With proper planning and coordination, TECH inc was able to beat the original cabling installation schedule, allowing the audiovisual contractor additional time to complete their work.

Our Services

From concept to maintenance, discover how we bring high value to your low voltage systems.

Read More

Design-Build

Learn how to plug our Integrated Construction Design-Build group into your project.

Read More

Schedule a Service Call

Need service? Contact us today.

Contact Us