First Baptist Church of Glenarden
- Large 9,500-member church needed a complete audiovisual infrastructure-including over 100,000 feet of cabling-within a two-month timeframe.
- TECH inc developed an efficient installation plan to fully utilize existing building spaces and pathways.
- We quickly mobilized scalable manpower to accommodate church functions and meet the accelerated schedule.
- We coordinated with the audiovisual equipment manufacturer to ensure a matched system.
- With proper planning and coordination, TECH inc was able to beat the original cabling installation schedule, allowing the audiovisual contractor additional time to complete their work.